Wednesday, September 13, 2006

Bathroom Remodeling Project

This was Ann's project from start to finish - new ceramic tile floor, new paint and hydrangea figured wallpaper, new hi-boy, fast flush commode with a self-closing seat, and new vinyl base mouldings. My only contribution was the base moulding. Of course, it was all done with the able help of Don Woodruff.

The one problem encountered at the outset was when taking out the old commode, we discovered that at some point in the past there had been a leak. The subfloor was rotten all around, but it was dry now. So, that all had to be replaced before proceeding.

Here's some pictures. None show it fully. Too small a room for a good shot.



0 Comments:

Post a Comment

<< Home